Skip to main content
Torre Universal, Costa Rica

Torre Universal

By
Place: San Jose, Costa Rica Construction: Completed 2020 Floors: 22 floors System(s) supplied: Studor P.A.P.A. System First project in Costa Rica to use the Studor Active Drainage System On-site visit by Aliaxis team very much appreciated
Read More

The Astaka

By
Location: Johor Bharu, Malaysia Main use: Residential Number of floors: 70 & 65 Status: Under construction System(s) supplied: Paling rainwater Paling Ecotech®
Read More