Skip to main content
Torre Universal, Costa Rica

Torre Universal

By
Place: San Jose, Costa Rica Construction: Completed 2020 Floors: 22 floors System(s) supplied: Studor P.A.P.A. System First project in Costa Rica to use the Studor Active Drainage System On-site visit by Aliaxis team very much appreciated
Read More

Hotel HYATT

By
Location: San Salvador, El Salvador Main use: Mixed Use Number of floors: 10 Status: Under construction System(s) supplied: Durman Rise® Flowguard Gold® Blazemaster®
Read More

TOM Condos

By
Location: Montreal, Canada Main use: Residential Number of floors: 40 Status: Under construction System(s) supplied: IPEX Aquarise® Blazemaster®
Read More